LO10-7360-201-20-4
LUBRICATION ORDER
30 AUGUST 1990
(Supersedes L010-7360-201-20-4, 4 Feb. 66)
BAKERY PLANT, TRAILER-MOUNTED, M-1945: DOUGH MIXING AND
MAKEUP OUTFIT
(MONORAIL AND TRAILER CHASSIS)
REFERENCE: L010-7360-201-20-1,-2,-3,-5,-6. C9100-IL
Approved for public release; distribution is unlimited.
Intervals are based on normal operation. Reduce to
Clean fittings before lubricating
compensate for abnormal operation and severe
conditions. During inactive periods, sufficient lubrication
Clean parts with SD (Solvent, drycleaning).
must be performed for adequate preservation.
Dry before lubricating.
Relubricate after washing or fording.
Broken arrow shafts indicate lubrication points on both
sides of the equipment.
LUBRICANT - INTERVAL
INTERVAL- LUBRICANT
Jacks (See Note 3)
GAA
Monorail Link Bushings
GAA
GAA
Monorail Fittings
(See Note 6)
(See Note 1)
Work Platform Support
OE
HBA
Master Cylinder
Hinges (See Note 2)
(See Note 5)
GAA
OE
Work Platform Hinge
Support Jacks
(See Note 2)
See Note 3)
GAA
Pintle
OE
(Remove, Clean, and
(See Note 2)
Pack)(See Note 3)
GAA
Spring Hangers and
Brackets (See Note 3)
Caster Wheel
GAA
GAA
Caster Wheel Bearing
Swivel Fitting
Fitting (See Note 3)
(See Note 3)
Chassis and Monorail
Card 1 of 2