TM 10-7360-201-10
2-6. PMCS PROCEDURES-- Continued
i.
Remove covers and open or remove access doors/panels only as required to visually inspect. If additional
disassembly and reassembly beyond steps normally done in setting up and operational procedures are required to
determine or repair actual defect, contact organizational maintenance or consult TM 10-7360-201-20.
2-7. PMCSTABLE
MIXING AND MAKEUP OUTFIT TRAILER (FRONT)
B - Before Operation
D - During Operation
A - After Operation
ITEM
INTERVAL
ITEM TO BE INSPECTED
Equipment Is Not
NO.
B
D
A
PROCEDURE
Ready/Available If:
Inoperative
1
POWER PANEL CIRCUIT BREAKERS,'PLUGS,
loose mounting and connections.
2
WATER TEMPERING TANK. Clean tank. Check
Unsanitary
for leaks.
3
VALVE, (CONTROL). Check for leaks.
4
WATER TRANSFER PUMP AND PIPING. Check
Inoperative
for leaks.
5
VALVES, (CHECK). Check for leaks.
6
Unsanitary
DOUGH TROUGH. Clean dough trough
2-21