TM 10-7360-201-10
2-7. PMCSTABLE-Continued
ITEM
INTERVAL
ITEM TO BE INSPECTED
Equipment Is Not
NO.
B
D
A
PROCEDURE
Ready/Available If:
Missing or under-charged.
FIRE EXTINGUISHERS. Inspect for broken seal.
Section III. OPERATION UNDER USUAL CONDITIONS
2-8. ASSEMBLY AND PREPARATION FOR USE
a. Site Selection
After the equipment is towed to the site of operation, arrange the unit for easy and efficient operation:
(1) Place all units within cable distance 50 feet (127 centimeters) from power source. Do not splice or put
extensions on any cables.
(2) Place the mixing and makeup trailer and the generator in any favorable location. Place generator in as dry a
spot as possible. If necessary to locate the generator on soft ground, arrange a foundation of planks or logs for
the unit.
(3) Locate the flour sifter and ingredient storage area on one side of the mixing and makeup machinery trailer and
place the proofing cabinets on the opposite side.
(4) Locate the oven trailers next to the proofing cabinets and place the bread storage area next to the oven trailers.
2-32