TM 10-7360-206-13
MOBILE KITCHEN TRAILER (MKT)
UNIT MAINTENANCE PROCEDURES
REPAIR ROOF VENT AND SCREEN ASSEMBLY KITCHEN WITH 12 ROOF VENT ASSEMBLIES
THIS SECTION COVERS:
Repair
INITIAL SETUP
Maintenance Level
Materials/Parts
Unit
Tools and Special Tools
Tool Kit, General Mechanics (WP 0055, Table 2, Item 1)
Extend roof assembly (1) to operational position.
1
Repair at this maintenance level is limited to unscrewing and replacing the stay knob (1) and roof vent
locking screw (2).
1
2
END OF WORK PACKAGE
0018 00-1/(2 Blank)