TM 10-7360-201-10
3.2.
DOUGH DIVIDER - Continued
(10) Place back end of top link arm (10) onto side lever pin.
(11) Tighten wingbolt on back of top link arm (10).
(12) Move knife and linkage to foremost position.
(13) Replace top lever cover.
3-3.
MOLDER PRESSURE BOARD
The molder pressure board (1) is located beneath the conveyor belt (2) and extends from one end of the molder to the
other.
3-10