TM 10-7360-201-10
3-4.
OVEN CONVEYOR CRANKS
The conveyor cranks (1) are wrapped in burlap and placed in a storage compartment during transit.
a. Inspection. Inspect cranks to be sure they operate properly and are not damaged.
b. Replacement. If crank is unserviceable, replace it with a serviceable one.
3-5.
PRESSURE RELIEF SHEETS
Inspect pressure relief sheets (1) to be sure they are in serviceable condition and securely fastened. During operation of
oven trailer, the access doors to the pressure relief sheets must be in OPEN position.
3-12