TM 10-7360-206-13
MOBILE KITCHEN TRAILER (MKT)
UNIT MAINTENANCE PROCEDURES
REPLACEMENT OF THE CABINET ASSEMBLIES
THIS SECTION COVERS:
Repair
INITIAL SETUP
Maintenance Level
Materials/Parts
Unit
Tools and Special Tools
Tool Kit, General Mechanics (WP 0055, Table 2, Item 1)
REPLACEMENT OF THE COOKING CABINET ASSEMBLY
Remove burner units (1).
Remove grease splash guard assembly (2).
Remove funnel and grease catcher assembly (3).
Remove griddle (4).
Remove cooking rack and frame assemblies (5).
Remove cutlery rack (6).
Replace defective cabinet or evacuate to direct support maintenance for repair.
Reinstall cutlery rack (6).
Reinstall cooking rack and frame assemblies (5).
Reinstall griddle (4).
Reinstall funnel and grease catcher assembly (3).
Reinstall grease splash guard assembly (2).
Reinstall burner units (1).
0026 00-1