MWO 10-7360-206-30-1
Insert
Grommet
Insert
Grommet
1-3/8 inch holes
3 places
Panel 2
Panel 1
Panel 3
Figure 3. Location of cable pass through holes in storage cabinet panels.
Drill five, 7/32 inch holes.
Panel 2
Figure 4. Location of cable clamp mounting holes in storage cabinet panel.
b. Modification of the MKT platform. The platform deck and frame must be modified
to allow the cross-way cable (that will be supplied with the MBU - MKT kit) to pass
down through the floor, underneath and across the platform, and back up through the
floor on the other side of the MKT isle.
1) Remove the condiment cabinet from the passenger side of the MKT by lifting it
straight up to clear the brackets that hold it in place. See Figure 1 for condiment cabinet
location.
7