MWO 10-7360-206-30-1
Clamps attached to this I-beam
See figure 9 for exact location.
A
B
B
A
Location of pass though holes in frame
See figure 8 for exact location.
Figure 7. Location of holes and cable clamps in MKT frame.
Bracket that attaches
MKT frame to trailer frame
Drill 1 3/8 inch hole
and insert grommet (item 12)
Section A-A
Figure 8. Location of pass-through hole in MKT frame.
d. Installation of cross-way cable clamps. NOTE: The clamps installed in this step
must be removed to install the cross-way cable when the MBU-MKT kit is installed. If
you already have the MBU-MKT kit, it is easiest to install the cross-way cable along with
these clamps to avoid removing them later.
1) Attach the five steel insulated clamps (item 11) to the aluminum I-beam of the MKT
platform frame using the self drilling #8 hex screws (Item 23). Pre-drill 1/8 inch holes
10