MWO 10-7360-206-30-1
B).
C
L
Attach cable clamp (item 11) to frame
Section B-B
Figure 9. Location of cable clamp on the MKT platform frame.
e. Installation of power converter bracket.
1) Insert one 5 inch carriage bolt (Item 22) into each of the square holes of the power
converter bracket (Item 27) and capture each carriage bolt using one 5/16 inch nut (Item
CAUTION:
Position the nut according to
Figure 10. This will
allow the carriage to
fit
loosely in the bracket, reducing the chance of damage to the bolts or personal injury when
the storage cabinet is removed for cleaning. DO NOT TIGHTEN 5/16 INCH BOLT.
11